Skip to content

Federal rule changes

Federal rules, proposed rules and notices for water, wastewater, electric and natural gas utilities, newest first, from the Federal Register.

Results

Showing 381–400 of 405

Source: Federal Register. Checked .

  • Effective WastewaterEnvironmental Protection Agency

    Standards for the Use or Disposal of Sewage Sludge

    Today's action amends the existing regulation regarding the land application, surface disposal, and incineration of sewage sludge. The amendments clarify existing regulatory requirements regarding operational standards for pathogen and vector attraction reduction and provide flexibility to the permitting authority and the regulated community in complying with the minimum frequency of monitoring requirements. The amendments also make the incineration subpart of the regulation totally self-implementing by providing information on air dispersion modelling, incinerator testing methods, and continuous emission monitors to the sewage sludge incinerator owner-operator. It also amends the existing General Pretreatment Regulation for Existing and New Sources of Pollution by adding a concentration for total chromium in land-applied sewage sludge to the list of pollutants that are eligible for a removal credit issued by a wastewater treatment works treating domestic sewage.

    Effective Sep 3, 1999Source checked
  • Proposed WastewaterStreamlining the General Pretreatment Regulations for Existing and New, Environmental Protection Agency

    Streamlining the General Pretreatment Regulations for Existing and New Sources of Pollution

    Today, EPA is proposing to revise several provisions of the General Pretreatment Regulations that address restrictions on and oversight of industrial users who introduce pollutants into publicly owned treatment works (POTWs). EPA is also proposing changes to certain program requirements to be consistent with National Pollutant Discharge Elimination System (NPDES) requirements. The proposals would reduce the regulatory burden on both industrial users and State and POTW Control Authorities without affecting environmental protection.

    Published Jul 22, 1999Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System

    The Federal Energy Regulatory Commission (Commission) is amending its regulations to: Extend the retention period and availability of information on curtailments and interruptions; allow the Commission staff and the public to access the supporting information on curtailments and interruptions, upon request; codify that OASIS users are allowed to make file transfers and queries as defined in the Standards and Communications Protocols (S&CP) Document; clarify that Responsible Parties are required to provide access to their OASIS sites for OASIS users making automated queries for extensive amounts of data; add a provision to allow Responsible Parties, under certain circumstances, to limit a user's access to an OASIS node; and add a provision to require OASIS users to notify Responsible Parties one month in advance of initiating a significant amount, or significantly increasing the use, of automated queries. The Commission believes that additional information about the state of the transmission system will enable customers to make better decisions about the quality of the transmission service they intend to purchase.

    Effective Jul 26, 1999Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System and Standards of Conduct

    The Federal Energy Regulatory Commission (the Commission) denies two requests for rehearing of an order issued on June 19, 1998 (Open Access Same-Time Information and Standards of Conduct) that, among other things, requires the unmasking of source and sink information and establishes an interim on-line discount policy.

    Published Feb 18, 1999Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System and Standards of Conduct

    The Federal Energy Regulatory Commission (the Commission) proposes to adopt a set of uniform business practices implementing the Commission's policies on transmission service price negotiation and improving interactions between transmission providers and customers over OASIS nodes and proposes to revise 18 CFR 37.5 to require compliance with these practices. In addition, the Commission proposes a consistent naming convention for path names, proposes to replace the Data Dictionary Element ``ANC__SERVICE__TYPE'' in the OASIS Standards and Communication Protocols Document (Version 1.3) with the term ``AS__TYPE,'' and proposes to clarify the terms ``DISPLACED,'' ``SUPERSEDED,'' and ``REFUSED'' in Sec. 4.2.10.2 of that same document and in the Data Dictionary Element.

    Published Feb 3, 1999Source checked
  • Effective ElectricFinal Rule, Energy Department +1

    Open Access Same-Time Information System and Standards of Conduct

    In this order, the Federal Energy Regulatory Commission (the Commission): issues a revised OASIS Standards and Protocols Document (Version 1.3); grants a three-month extension of time for implementing Version 1.3 of the revised OASIS Standards and Protocols Document; and grants a two-month extension of time for implementing the Commission's requirements on unmasking source and sink information.

    Effective Mar 1, 1999Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System

    The Federal Energy Regulatory Commission (Commission) proposes to: amend its regulations to extend the retention period and availability of information on curtailments and interruptions and require this information to include other uses of the congested path at the time of such incidents; amend its regulations to clarify that OASIS nodes must have the capability to allow OASIS users to make file transfers and automated computer-to-computer file transfers and queries; amend its regulations to clarify that Responsible Parties are required to provide access to their OASIS sites for OASIS users making automated queries or extensive requests for data; and add a provision to its regulations that would allow Responsible Parties, under certain circumstances, to limit a user's access to the node if that user's grossly inefficient method of accessing an OASIS node or obtaining information from the node degrades the performance of the node.

    Published Aug 7, 1998Source checked
  • Effective ElectricFinal Rule, Energy Department +1

    Open Access Same-Time Information System and Standards of Conduct

    In this order, the Federal Energy Regulatory Commission (the Commission): finds that ``source and sink'' information must be unmasked at the time when a transmission provider updates the transmission reservation posting to show the customer's confirmation that it wishes to finalize a transaction; implements interim procedures for the on-line negotiation of transmission service price discounts; and adopts a comprehensive update of the OASIS Standards and Communications Protocols Document that implements a number of findings made by the Commission in Order No. 889-A and in response to industry suggestions.

    Effective Sep 18, 1998Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Notice of Clarification and New Docket Prefix EY

    The Federal Energy Regulatory Commission is clarifying that, as required by section 37.4(a)(2) of the Commission's Rules and Regulations, 18 CFR 37.4(a)(2) (1997), transmission providers should report emergency circumstances affecting system reliability to the Commission within 24 hours by sending reports by facsimile to the Secretary of the Commission. In addition, the Commission is clarifying the information that transmission providers should include in the reports. The Commission is also establishing a new docket prefix, EY, to track the reports.

    Published Jun 15, 1998Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System and Standards of Conduct

    The Federal Energy Regulatory Commission is denying the requests for rehearing of its order on rehearing of the final rule in this proceeding. The final rule required public utilities that own, control, or operate facilities used for the transmission of electric energy in interstate commerce to create or participate in an Open Access Same-Time Information System (OASIS) in conformance with Commission regulations. The final rule also required those public utilities to implement standards of conduct to functionally separate transmission and wholesale merchant functions. The order on rehearing made minor revisions to the final rule and implemented a revised transmission discounting policy. This order denies the requests for rehearing filed by six interested persons in response to the order on rehearing of the final rule.

    Effective Nov 25, 1997Source checked
  • Effective WastewaterStreamlined Procedures for Modifying Approved Publicly Owned Treatment, Environmental Protection Agency

    Streamlined Procedures for Modifying Approved Publicly Owned Treatment Works Pretreatment Programs

    Today, EPA is revising the procedures for modifying the requirements of approved Publicly Owned Treatment Works (POTW) Pretreatment Programs incorporated into National Pollutant Discharge Elimination System (NPDES) permits issued to POTWs. The new regulations will reduce the administrative burden and cost associated with maintaining approved pretreatment programs without affecting environmental protection.

    Effective Aug 18, 1997Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System and Standards of Conduct

    The Federal Energy Regulatory Commission is revising its policy on posting discounts to be consistent with changes in the discount policy that we simultaneously are implementing in Order No. 888-A. Additionally, we are making other minor revisions to 18 CFR Part 37--which contains rules establishing and governing transmission information networks and standards of conduct--to be responsive to arguments made on rehearing and to make the regulations operate more smoothly. In addition, the Commission requests that the How Working Group propose the necessary changes in the Standards and Protocols document and the Data Dictionary by June 2, 1997 to address four issues.

    Effective May 13, 1997Source checked
  • Effective ElectricFinal Rule, Energy Department +1

    Promoting Wholesale Competition Through Open Access Non- Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities

    The Federal Energy Regulatory Commission (Commission) reaffirms its basic determinations in Order No. 888 and clarifies certain terms. Order No. 888 requires all public utilities that own, control or operate facilities used for transmitting electric energy in interstate commerce to have on file open access non-discriminatory transmission tariffs that contain minimum terms and conditions of non- discriminatory service. Order No. 888 also permits public utilities and transmitting utilities to seek recovery of legitimate, prudent and verifiable stranded costs associated with providing open access and Federal Power Act section 211 transmission services. The Commission's goal is to remove impediments to competition in the wholesale bulk power marketplace and to bring more efficient, lower cost power to the Nation's electricity consumers.

    Effective May 13, 1997Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System (OASIS) and Standards of Conduct

    The Federal Energy Regulatory Commission, at the request of the How Working Group, is clarifying its Phase 1 OASIS regulations concerning ``next hour'' reservations of transmission service. The Commission finds that, during Phase 1, a request for transmission service made after 2:00 p.m. of the day preceding the commencement of such service, will be ``made on the OASIS'' if it is made directly on the OASIS, or, if it is made by facsimile or telephone and promptly (within one hour) posted on the OASIS by the Transmission Provider. In all other circumstances, requests for transmission service must be made exclusively on the OASIS.

    Effective Dec 27, 1996Source checked
  • Proposed WastewaterStreamlined Procedures for Modifying Approved Publicly Owned Treatment, Environmental Protection Agency

    Streamlined Procedures for Modifying Approved Publicly Owned Treatment Works Pretreatment Programs

    EPA is today proposing to revise the procedures for modifying the requirements of approved Publicly Owned Treatment Works (POTW) Pretreatment Programs incorporated into National Pollutant Discharge Elimination System (NPDES) permits issued to POTWs. The new regulations are designed to reduce the administrative burden and cost associated with maintaining approved pretreatment programs without affecting environmental protection.

    Published Jul 30, 1996Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System

    The Federal Energy Regulatory Commission (Commission) had previously announced that it would hold a technical conference on June 17, 1996 \1\ following the submission of an additional report from the How Group correcting any deficiencies in the standards and protocols document issued with the final rule in this proceeding. This notice cancels the technical conference and allows comments on the report filed with the Commission on June 7, 1996.

    Published Jun 18, 1996Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Promoting Wholesale Competition Through Open Access Non- Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities

    The Federal Energy Regulatory Commission (Commission) is issuing a Final Rule requiring all public utilities that own, control or operate facilities used for transmitting electric energy in interstate commerce to have on file open access non-discriminatory transmission tariffs that contain minimum terms and conditions of non- discriminatory service. The Final Rule also permits public utilities and transmitting utilities to seek recovery of legitimate, prudent and verifiable stranded costs associated with providing open access and Federal Power Act section 211 transmission services. The Commission's goal is to remove impediments to competition in the wholesale bulk power marketplace and to bring more efficient, lower cost power to the Nation's electricity consumers.

    Effective Jul 9, 1996Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Open Access Same-Time Information System (Formerly Real-Time Information Networks) and Standards of Conduct

    The Federal Energy Regulatory Commission is adding rules establishing and governing an Open Access Same-time Information System (OASIS) (formerly real-time information networks) and prescribing standards of conduct. Under this final rule, each public utility (or its agent) that owns, controls, or operates facilities used for the transmission of electric energy in interstate commerce will be required to create or participate in an OASIS that will provide open access transmission customers and potential open access transmission customers with information, provided by electronic means, about available transmission capacity, prices, and other information that will enable them to obtain open access non-discriminatory transmission service. This final rule requires each public utility subject to the rule to implement standards of conduct to functionally separate transmission and wholesale power merchant functions and the creation of a basic OASIS system. In addition, some of the standards and formats for OASIS nodes are prescribed in a document entitled OASIS Standards and Communication Protocols that is being issued with the final rule. The Commission also is establishing further procedures to complete the standards for displays and formats. The development of OASIS requirements will continue in a Phase II, in which the Commission will continue to develop the requirements for a fully functional OASIS.

    Effective Jul 9, 1996Source checked
  • Effective WastewaterEnvironmental Protection Agency

    Land Disposal Restrictions Phase IIIDecharacterized Wastewaters, Carbamate Wastes, and Spent Potliners

    Elsewhere in this Federal Register, EPA is promulgating a final rule which, among other things, revises treatment standards for hazardous wastewaters that exhibit the characteristic of ignitability, corrosivity, reactivity, or toxicity. The revised treatment standards were promulgated to implement the mandate of the opinion of the Circuit Court of Appeals for the District of Columbia Circuit in Chemical Waste Management (CWM) v. EPA, 976 F. 2d 2 (D.C. Cir. 1992) cert. denied 507 U.S. 1057 (1993). On March 26, 1996, President Clinton signed into law the Land Disposal Program Flexibility Act of 1996 which, among other things, provides that the wastes in question are no longer prohibited from land disposal so long as they are not hazardous wastes at the point they are land disposed. By operation of the statute, this provision is made effective immediately and therefore essentially overrules this portion of the CWM opinion. EPA accordingly is incorporating the statutory provision into the regulations by amending and/or withdrawing the portions of the regulations that are superseded by the new legislation. The amendment/withdrawal of these standards does not affect any other part of the final rule; and the effective dates of the other actions in the final rule likewise will not change. Furthermore, EPA is amending parts of the LDR Phase II final rule, published on September 19, 1994 (59 FR 47982) which are also overruled by the legislation.

    Effective Apr 5, 1996Source checked
  • Proposed WastewaterEnvironmental Protection Agency

    National Pollutant Discharge Elimination System Permit Application Requirements for Publicly Owned Treatment Works and Other Treatment Works Treating Domestic Sewage

    The Environmental Protection Agency (EPA) announces that the public comment period for the National Pollutant Discharge Elimination System (NPDES) Permit Application Requirements for Publicly Owned Treatment Works and Other Treatment Works treating Domestic Sewage proposed rulemaking (60 FR 62546, December 6, 1995) will be extended from March 6, 1996 to March 29,1996 due to the effects of the recent Federal government shutdown. EPA is proposing to revise its NPDES permit application requirements and to develop a new permit application form, Form 2A, in order to streamline the permit application process for POTWs and improve the quality of permits issued to those facilities. The Agency is also proposing permit application requirements and an application form, Form 2S, for Treatment Works Treating Domestic Sewage to provide permit writers with the information necessary to issue effective permits for these facilities. In developing these proposed forms and application requirements, the Agency has consulted with State and municipal representatives and has addressed their concerns. As a result, the proposed forms and applications would minimize the burden on permittees and permitting authorities and result in greater environmental protection through more effective NPDES permits.

    Published Mar 4, 1996Source checked

Each search looks at up to 50 of the newest matching documents from each source we follow for a sector. Informational, not legal advice; confirm with your primacy agency or counsel.