The Federal Energy Regulatory Commission is issuing this final rule to revise its regulations implementing the National Environmental Policy Act and its Rules of Practice and Procedure to remove reference to the Council on Environmental Quality's rescinded regulations.
Effective Aug 18, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) approves proposed Reliability Standard CIP-015-1 (Cyber Security--Internal Network Security Monitoring), which the North American Electric Reliability Corporation (NERC), submitted in response to a Commission directive. In addition, the Commission directs NERC to develop certain modifications to proposed Reliability Standard CIP-015-1 to extend internal network security monitoring to include electronic access control or monitoring systems and physical access control systems outside of the electronic security perimeter. The Commission also provides greater clarity about the term CIP-networked environment as it is used in proposed Reliability Standard CIP-015-1.
Effective Sep 2, 2025Source checked
Effective Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration
This DFR revises the property damage threshold for determining when a release from a gas or hazardous liquid pipeline facility meets the definition of a reportable incident or accident. This change clarifies that certain indirect impacts associated with investigating and repairing a release do not contribute to that threshold. This DFR also adopts an inflation adjusted property damage threshold for reporting hazardous liquid pipeline accidents identical to the one previously adopted for reporting gas pipeline incidents.
Effective Oct 9, 2025Source checked
Effective Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration
This DFR extends the deadline for submitting annual reports for operators of gas distribution pipelines, gas transmission pipelines, regulated gas gathering pipelines, Type R gas gathering lines, underground natural gas storage facilities, and liquefied natural gas facilities. Annual reports for gas pipeline and gas pipeline storage facilities are now due on June 15, consistent with existing requirements for hazardous liquid pipelines.
Effective Oct 9, 2025Source checked
Proposed ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) seeks information and stakeholder perspectives to help the Commission explore whether, and if so how, to revise its Part 157, Subpart F blanket certificate regulations to adjust the cost limitations for projects that interstate natural gas pipelines may construct without a case- specific authorization order.
Published Jun 24, 2025Source checked
Proposed ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) proposes to remove from its regulations a rule that precludes the issuance of authorizations to proceed with construction activities with respect to natural gas facilities approved pursuant to section 3 or section 7 of the Natural Gas Act for a limited time while certain requests for rehearing are pending before the Commission.
Published Jun 24, 2025Source checked
Proposed Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration
PHMSA is publishing this advance notice of proposed rulemaking (ANPRM) to solicit stakeholder feedback on whether to repeal or amend any requirements in the Pipeline Safety Regulations to eliminate undue burdens on the identification, development, and use of domestic energy resources and to improve government efficiency.
Published Jun 4, 2025Source checked
Proposed Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration
PHMSA is publishing this advance notice of proposed rulemaking to solicit stakeholder feedback on potential opportunities to improve the cost-effectiveness of its repair requirements for gas transmission and hazardous liquid or carbon dioxide pipelines. PHMSA also seeks stakeholder feedback on authorizing a risk-based approach for determining the inspection interval for in-service breakout tanks.
Published May 21, 2025Source checked
Effective Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration
As directed by the Executive order of January 20, 2025, "Restoring Names that Honor American Greatness," PHMSA is amending its regulations to change the name of the body of water known previously as the "Gulf of Mexico" to the "Gulf of America."
Effective May 20, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.
The Environmental Protection Agency (EPA) is finalizing, largely as proposed, a narrow modification to its 2022 Construction General Permit (CGP) to expand the list of areas eligible for coverage to include construction projects in all Lands of Exclusive Federal Jurisdiction. This modification is necessary because the EPA is the permitting authority in Lands of Exclusive Federal Jurisdiction, and when the CGP was issued on February 17, 2022, the permit did not specifically provide eligibility for these areas as a class. The modification also clarifies the CGP requirements that apply to projects that discharge to receiving waters within Lands of Exclusive Federal Jurisdiction in response to the Supreme Court's recent decision in City and County of San Francisco v. EPA. The permit modification and accompanying permit fact sheet can be found at https://www.epa.gov/ npdes/2022-construction-general-permit-cgp.
Effective Apr 8, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission amends its regulations to incorporate by reference, with certain exceptions, the latest version (Version 004) of the Standards for Business Practices and Communication Protocols for Public Utilities adopted by the Wholesale Electric Quadrant (WEQ) of the North American Energy Standards Board (NAESB). The revisions made by NAESB in the WEQ Version 004 standards are designed to aid public utilities with the consistent and uniform implementation of requirements promulgated by the Commission as part of the pro forma Open Access Transmission Tariff (OATT).
Effective Apr 28, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
In accordance with the Commission's regulations, the Commission, by its designee, the Executive Director, issues this annual update to the fee schedule in the appendix to the part, which lists per-acre rental fees by county (or other geographic area) for use of Government lands by hydropower licensees.
Effective Feb 12, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
In accordance with the Commission's regulations, the Commission issues this update of its filing fees. This document provides the yearly update using data in the Commission's Financial System to calculate the new fees. The purpose of updating is to adjust the fees on the basis of the Commission's costs for Fiscal Year 2024.
Effective Mar 3, 2025Source checked
Proposed ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) proposes to approve proposed Reliability Standards PRC-024-4 (Frequency and Voltage Protection Settings for Synchronous Generators, Type 1 and Type 2 Wind Resources, and Synchronous Condensers) and PRC-029-1 (Frequency and Voltage Ride-through Requirements for Inverter-Based Resources), which the North American Electric Reliability Corporation submitted in response to Commission directives. The Commission seeks comments on all aspects of the proposed approval.
Published Jan 21, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
In this final rule, the Commission revises its Continuity of Operations Plan regulations to include, in its hierarchy of delegation of Commission authority, the Director and other staff of the Office of Energy Infrastructure Security, who were not included when the regulations were earlier revised.
This action announces the Environmental Protection Agency's (EPA's) approval of alternative testing methods for use in measuring the levels of contaminants in drinking water to determine compliance with national primary drinking water regulations. The Safe Drinking Water Act authorizes EPA to approve the use of alternative testing methods through publication in the Federal Register. EPA is using this streamlined authority to make two additional methods available for analyzing drinking water samples. This expedited approach provides public water systems, laboratories, and primacy agencies with more timely access to new measurement techniques and greater flexibility in the selection of analytical methods, thereby reducing monitoring costs while maintaining public health protection.
Effective Jan 16, 2025Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) is issuing a final rule to amend its regulations governing the maximum civil monetary penalties assessable for violations of statutes, rules, and orders within the Commission's jurisdiction. The Federal Civil Penalties Inflation Adjustment Act of 1990, as amended most recently by the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, requires the Commission to issue this final rule.
The Environmental Protection Agency (EPA) is proposing a narrow modification to its 2022 CGP to expand the list of areas eligible for coverage to include construction projects in Lands of Exclusive Federal Jurisdiction. This modification is necessary because the EPA is the permitting authority in Lands of Exclusive Federal Jurisdiction, and when the CGP was issued on February 17, 2022, the permit did not specifically provide eligibility for all of these areas. The proposed modification would also clarify the CGP requirements that apply to projects that discharge to receiving waters within Lands of Exclusive Federal Jurisdiction. The EPA seeks comment only on the proposed permit revisions and the accompanying fact sheet. The fact sheet and proposed permit modification can be found at https:// www.epa.gov/npdes/stormwater-discharges-construction-activities.
Published Dec 13, 2024Source checked
Effective ElectricEnergy Department, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission amends its regulations to incorporate by reference, with certain enumerated exceptions, the latest version (Version 4.0) of Standards for Business Practices of Interstate Natural Gas Pipelines adopted by the Wholesale Gas Quadrant (WGQ) of the North American Energy Standards Board (NAESB). NAESB's revisions in this version of the standards are designed to promote greater efficiency and reliability of the natural gas industry's operations and strengthen the cybersecurity protections provided within the standards.
Effective Feb 7, 2025Source checked