Results

Showing 61–80 of 405

Source: Federal Register. Checked .

  • Effective WaterEnvironmental Protection Agency

    Announcement of Final Regulatory Determinations for Contaminants on the Fifth Drinking Water Contaminant Candidate List

    The U.S. Environmental Protection Agency (EPA) is announcing final regulatory determinations for nine contaminants listed on the fifth Contaminant Candidate List. Specifically, the Agency is making final determinations not to regulate 2-aminotoluene, cylindrospermopsin, ethoprop, microcystins, molybdenum, permethrin, profenofos, tebuconazole, and tribufos. The Safe Drinking Water Act (SDWA) requires the EPA to make regulatory determinations every five years on at least five unregulated contaminants. A regulatory determination is a decision about whether or not to begin the process to propose and promulgate- a national primary drinking water regulation (NPDWR) for an unregulated contaminant.

    Published Mar 19, 2026Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Categorical Exclusion Under the National Environmental Policy Act for Certain Terminations or Revocations of Water Power Licenses and Exemptions

    The Federal Energy Regulatory Commission (Commission) proposes to amend section 380.4 of its regulations implementing the National Environmental Policy Act (NEPA) to expand an existing Categorical Exclusion (CE). A CE describes a category of actions that a Federal agency has determined normally does not significantly affect the quality of the human environment, absent extraordinary circumstances, and so does not trigger NEPA's requirement to prepare an environmental document. The proposed revision would add a category of actions to an existing CE to include terminations or revocations of water power licenses and exemptions that will result in minor or no ground disturbing activity and minor or no changes in reservoir conditions and downstream flows.

    Published Feb 24, 2026Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Implementation of the Executive Order Entitled “Zero-Based Regulatory Budgeting To Unleash American Energy”; Correction

    The Federal Energy Regulatory Commission (FERC) published a direct final rule in the Federal Register of October 21, 2025, revising its regulations to insert a conditional sunset date into certain regulations in response to Executive Order 14270, "Zero-Based Regulatory Budgeting to Unleash American Energy." The document contained an error. This document corrects the regulations.

    Effective Feb 6, 2026Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Transfer of Delegation of Authority From the Office of Energy Policy and Innovation to the Office of Technical Reporting and Economics and to the Office of the General Counsel

    The Commission is issuing this final rule to revise its delegations of authority to align with an internal Commission reorganization, which reassigned certain responsibilities from the former Office of Energy Policy and Innovation (OEPI), which has been disbanded, to the new Office of Technical Reporting and Economics (OTRE) and to the Office of the General Counsel (OGC). This final rule transfers delegated authority from the Director of OEPI to the Director of OTRE and to the General Counsel, to allow their respective offices to process routine, non-controversial matters efficiently.

    Effective Feb 2, 2026Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Annual Update of Filing Fees

    In accordance with the Commission's regulations, this Final rule provides the yearly update using data in the Commission's Financial System to calculate new filing fees. The purpose of this Final Rule is to adjust the fees on the basis of the Commission's costs for Fiscal Year 2025.

    Effective Feb 19, 2026Source checked
  • Effective Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration

    Pipeline Safety: Class Location Change Requirements

    PHMSA is updating its regulations to allow operators to apply modern risk management principles in addressing the safety of gas pipelines affected by class location changes. Relying on an approach originally developed in the 1950s, PHMSA's regulations use class locations to provide an additional margin of safety in the design, construction, testing, operation, and maintenance of gas pipelines based on population density. When the class location of a pipeline changes due to an increase in population density, an operator may need to take certain actions to confirm or to revise the maximum allowable operating pressure of a segment. Because the methods traditionally used for that purpose do not account for modern risk management principles, PHMSA has granted special permits for more than two decades allowing operators to use an integrity-management-based alternative. This final rule adopts that `IM alternative' by regulation to provide operators with an additional method for confirming or restoring the maximum allowable operating pressure of certain eligible segments that experience class location changes.

    Effective Mar 16, 2026Source checked
  • Proposed WaterEnvironmental Protection Agency

    National Primary Drinking Water Regulation for Perchlorate

    The U.S. Environmental Protection Agency ("EPA" or the "Agency") is proposing a National Primary Drinking Water Regulation (NPDWR) for perchlorate and a health-based Maximum Contaminant Level Goal (MCLG) under the Safe Drinking Water Act (SDWA). In this action, the EPA is proposing to set the perchlorate MCLG at 0.02 mg/L (20 [micro]g/L). The EPA is also proposing and taking comment on setting an enforceable Maximum Contaminant Level (MCL) for perchlorate at 0.02 mg/ L (20 [micro]g/L), 0.04 mg/L (40 [micro]g/L), or 0.08 mg/L (80 [micro]g/L). The EPA is also proposing requirements for water systems to conduct monitoring for perchlorate in drinking water, take mitigation actions if the level exceeds the MCL, provide information about perchlorate to their consumers through public notification and consumer confidence reports, and report to their respective primacy agency. The Administrator has determined that the benefits of this regulation would not justify the costs; however, the EPA is required to issue an NPDWR and MCLG for perchlorate in response to the D.C. Circuit's decision in NRDC v. Regan.

    Published Jan 6, 2026Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Five-Year Review of the Oil Pipeline Index; Correction

    The Federal Energy Regulatory Commission published a document in the Federal Register of November 24, 2025, concerning a notice of proposed rulemaking seeking comment on the Commission's proposed index level used to determine annual changes to oil pipeline rate ceilings. The document contained an error.

    Published Dec 19, 2025Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Implementation of the Executive Order Entitled “Zero-Based Regulatory Budgeting To Unleash American Energy”; Partial Recission

    The Commission is partially rescinding a direct final rule that inserted a conditional sunset date into certain regulations. The Commission is rescinding the sunset provision from one regulation because it received a significant adverse comment in response to an identical proposed rule which was published concurrently with the direct final rule.

    Effective Jan 20, 2026Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Duty of Candor

    The Federal Energy Regulatory Commission is withdrawing a notice of proposed rulemaking, which proposed adding a new section to 18 CFR part 1 to require that any entity communicating with the Commission or other specified organizations related to a matter subject to the jurisdiction of the Commission submit accurate and factual information and not submit false or misleading information or omit material information. The Commission is also terminating this rulemaking proceeding.

    Published Nov 25, 2025Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Supplemental Review of the Oil Pipeline Index Level

    The Federal Energy Regulatory Commission (Commission) is withdrawing the supplemental notice of proposed rulemaking (Supplemental NOPR) that proposed to amend the index level used to determine annual changes to oil pipeline rate ceilings for the remainder of the five-year period that began July 1, 2021, and concludes June 30, 2026.

    Published Nov 25, 2025Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Authorizations for Certain Activities at Liquefied Natural Gas Plants

    The Federal Energy Regulatory Commission (Commission) seeks information and stakeholder perspectives to help the Commission explore whether, and if so how, to revise our Part 153, 157, and 380 regulations to establish procedures for authorizing activities at liquefied natural gas plants without case-specific authorization orders under sections 3 and 7 of the Natural Gas Act.

    Published Nov 25, 2025Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Safe Harbor Policy for Data Providers to Price Index Developers

    The Federal Energy Regulatory Commission is withdrawing a notice of proposed rulemaking, which proposed to amend its regulations to codify the Safe Harbor Policy established in the Commission's Policy Statement on Natural Gas and Electric Price Indices. The Commission is also terminating this rulemaking proceeding.

    Published Nov 25, 2025Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Five-Year Review of the Oil Pipeline Index

    The Federal Energy Regulatory Commission (Commission) invites comments on its proposed index level used to determine annual changes to oil pipeline rate ceilings. The Commission proposes to use the Producer Price Index for Finished Goods (PPI-FG)-1.42% as the index level for the five-year period commencing July 1, 2026. The Commission invites interested persons to submit comments regarding this proposal and any alternative methodologies for calculating the index.

    Published Nov 24, 2025Source checked
  • Proposed ElectricEnergy Department, Federal Energy Regulatory Commission

    Standards for Business Practices of Interstate Natural Gas Pipelines

    The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to incorporate by reference certain modifications to the latest version (Version 4.0) of Standards for Business Practices of Interstate Natural Gas Pipelines adopted by the Wholesale Gas Quadrant (WGQ) of the North American Energy Standards Board (NAESB). NAESB's revisions in Version 4.0 of the standards streamline the process for accessing publicly available gas-electric coordination data during extreme cold weather or emergency events.

    Published Nov 19, 2025Source checked
  • Effective ElectricEnergy Department, Federal Energy Regulatory Commission

    Removal of Regulations Limiting Authorizations To Proceed With Construction Activities Pending Rehearing

    The Federal Energy Regulatory Commission (Commission) removes from its regulations a rule that precludes the issuance of authorizations to proceed with construction activities with respect to natural gas facilities approved pursuant to section 3 or section 7 of the Natural Gas Act for a limited time while certain requests for rehearing are pending before the Commission.

    Effective Nov 10, 2025Source checked
  • Effective Natural gasTransportation Department, Pipeline and Hazardous Materials Safety Administration

    Pipeline Safety: Standards Update-ASTM F2600

    PHMSA is confirming the effective date for the DFR that appeared in the Federal Register on July 1, 2025. The DFR amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference ASTM International's updated industry standard ASTM F2600, "Standard Specification for Electrofusion Type Polyamide-11 Fittings for Outside Diameter Controlled Polyamide-11 Pipe and Tubing."

    Effective Jan 1, 2026Source checked

Each search looks at up to 50 of the newest matching documents from each source we follow for a sector. Informational, not legal advice; confirm with your primacy agency or counsel.